Guides / OCS flooring, doors and fittings: what to check

Took HDB's Optional Component Scheme (OCS)? How to check the flooring, doors and fittings at key collection

Updated 2026-11-23

If you opted in to HDB's Optional Component Scheme (OCS) when you booked your flat, your BTO arrives with more already installed: floor finishes in the bedrooms and living room, internal doors, and bathroom fittings such as the basin and shower set. That's more to enjoy on day one, and also more to check. Items that look "finished" are easy to walk past, but a chipped door or a lifting floor strip is exactly the kind of defect you want on your list in the first month.

What OCS usually includes

The exact items depend on your flat type and project, so check your own booking documents or sales brochure. Property guides that describe the scheme (DollarsandSense, SingSaver) list roughly this:

Without OCS, the bedroom and living room floors are usually left as bare concrete and there are no bedroom doors. Kitchen and bathroom tiles, the main door and gate, windows and sockets come with every flat. Some newer projects come with finishes and doors already in for everyone, so your brochure is the final word.

The cost was added to the flat price, and the guides say you could only opt in at the flat booking appointment, not later.

Checking the floor finishes

OCS flooring may be tiles or another material such as vinyl, depending on the project. Check every room that has it:

Checking the internal doors

Do this for every bedroom and bathroom door, and the sliding partition if you have a 2-room Flexi:

  1. Open and close it slowly, then let go halfway. It shouldn't scrape the floor, rub the frame or swing by itself.
  2. Test the handle and latch. The door should click shut and stay shut. Try the lock on bathroom doors from both sides.
  3. Look at the gaps around the edges with the door closed. A much bigger gap at the top than the bottom means the door isn't hung straight.
  4. Run your hand over the surface and edges. Look for chips, dents, peeling laminate and scratches, especially near the handle and at the bottom.
  5. Check the frame is firmly fixed to the wall, with no cracks in the plaster around it.

Our doors, gate and locks guide covers the main door and gate as well.

Checking the bathroom fittings

The rest of the bathroom is in our bathroom check guide.

Reporting what you find

Put OCS items on the same list as everything else, numbered with tape (#01, #02…) and photographed close up and wide. Submit it to your Building Service Centre within one month of key collection and before your renovation starts, so nobody can say your contractor caused the damage. If you're not sure whether an item was part of your OCS package, note it anyway and ask the BSC. Step-by-step help: how to report BTO defects.

For a full walk-through of every room, use the room-by-room BTO defect checklist or the free printable PDF. And since vinyl and doors can show wear only after a few months of use, look at them again before your 12-month DLP ends: the one-year DLP check.

More guides for new homeowners →